Tuesday, July 25, 2006

a very strange July morning

On my way to work this morning I found myself singing along to the radio. After a few minutes and a couple verses later I finally realized that I was singing along to "Winter Wonderland", and then the Christmas song. At which point it finally dawned on me, Christmas is only 5 months away. Here I am in the midst of summer, and a muggy July day, thinking of school supplies and Christmas Shopping and ultimately Christmas Knitting. Where has all the time gone?

Well, wherever the time went, I certainly didn't use it for knitting or blogging, sorry for the long absence. In my knitting absence I've realized a couple of things. I'm not a sock knitter, my feet are not very tolerable to wool socks. I do like small objects knit in the round, so I guess I'll stick with gloves and mittens. I like lace, but I have an extreme aversion to ripping anything I've knit. I'd rather start over or simply rationalize the any mistake I've made can simply be called a design enhancement. Although I love math, Knitting math can often times boggle my mind. Logically it makes sense, I just can't come to terms with gauge. I can knit it, measure it, calculate the changes. But things always seem to change along the way.

Ah well, maybe I need to knit more. Or just come to terms with the way I knit. This is it, this is me. this is what I knit. (There will be pictures when I find my camera.)

So Happy Knitting y"all! I hope you're having a great summer. And don't fret, Christmas is 5 months away. That's a whole lot of knitting time.

Wednesday, May 03, 2006

still here, sometimes

Real life is kicking me in the butt, and I haven't much time for knitting or blogging. I'll be back soon...

Happy Knitting y'all!

Sunday, April 02, 2006

the belated March FO


Pattern: adapted from several glove patterns
Yarn: Axelle's Lisa (100% Superwash Merino) in Briar Rose
Needles: US4 and US2 for the tips


The end of March has been a bit hectic for me, dealing with work issues, family and health issues (biopsies, hypertensive parents, emergency rooms, and a limping, blinded doggie). Somedays I don't know whether I'm coming or going. The gloves weren't my intended FO to show this month, I actually expected a to finish this...

Li's Herringbone Rib scarf excellent knitting for all those waiting rooms. As I started on the last skein of the yarn for the scarf, I realized that I really should finish off the set of gloves I started last year, (before I run out of yarn) The lone glove has been sitting around for quite a long time. Last Sunday I picked up my dpns, and I finished it up the 4 days!! If I had known I could finish glove in 4 days, I'd probably have a few more pairs lying around. Dealing with all those fingers was definitely easier this time around.

I love the orangey bits in the yarn, eh, it'll be perfect for my April Project Spectrum. Maybe.

Have a great week and Happy Knitting!

Friday, March 17, 2006

sophisticated snowflakes

At one time or another, we've all made paper snowflakes by folding paper and cutting. Here's a variation on the theme. Kirigami, which in translation means "cutting paper" and Origamic Architecture, 3D Pop-up cards and paper sculpture.

in RED and PINK for Lolly's Project Spectrum


**************

My project spectrum plans of natural dyeing has been slightly delayed. Apparently the tree bark I was planning to use needs a nice cool water soak of several days or weeks....Hopefully I'll get to it before the month ends. (and next time I'll remember to read ahead and plan accordingly...)

Have a great weekend!
Happy Knitting and Paper Cutting!

Tuesday, March 07, 2006

finally blocked...


Pattern: River from Rowan 38 by Sharon Miller
Yarn: Rowan Kid Silk Haze in Majestic
Needles: US 10.5